6/11/2019 Posted On: 6/11/2019 By: CheapCigarMan Info: Just spoke with the Dillon Ranger District office. Said the Peru Creek road to the Argentine Pass trailhead is closed. Ironically, maintenance vehicle traffic to make repairs damaged the road. They are just now discussing repair options so it will be a long while before it opens again. There's a possibility that the road might be closed all summer. Said the way to get status on the effort would be to call them. (970) 468-5400 | ||||
9/6/2018 Posted On: 9/6/2018 By: sigepnader Info: Rough 2WD the entire way to the trailhead. One area of standing water about two miles in but can be drove around. I wouldnt take a sedan up but if you have some clearance you will be fine. | ||||
7/10/2018 Posted On: 7/10/2018 By: Shrink_on_the_climb Info: Road was in good condition this morning, just a few holes that were easily avoidable and the occasional water crossing. Made it up pretty easily in an AWD SUV with decent clearance - took about 50 minutes from to cover the 4.5 miles of dirt road. It was totally worth it, with tons of wildflowers and only a few other hikers on the trail (that is, until Grays). | ||||
10/15/2017 Posted On: 10/15/2017 By: montanahiker Info: Road is dry all the way to the parking area except for a short section where the road is right next to the creek. Lots of potholes but anything higher than a passenger car will be fine as long as you don't rush. | ||||
7/23/2017 Posted On: 7/24/2017 By: AlexeyD Info: A few large puddles around a mile past the start of 206. Otherwise, lots of potholes, but overall I'd put this more in the category of "rough 2wd", maybe comparable to 4th of July access road. On a separate note: saw a few vehicles make it all the way up to Argentine Pass from the Waldorf Mine side. Also saw some genius 4-wheeling right over the tundra. Seriously people? | ||||
6/24/2017 Posted On: 6/24/2017 By: randallson Info: Peru Creek road opened 6/22. Overall road is in good shape. Some avalanche debris covers the road about 1/4 mile from the Argentine Pass parking area. A couple vehicles plowed through but there is also room to park about 6 cars at the debris field. | ||||
6/15/2017 Posted On: 6/15/2017 By: rpdawes Info: The gate at start of Peru Creek Road is still closed. Today I went there to check the status of the road. | ||||
11/10/2016 Posted On: 11/11/2016 By: BillMiddlebrook Info: Still open and dry. I called the USFS office in Dillon and they said they plan on closing the Peru Creek road on November 22nd, but I suspect it may close earlier if we get a snow storm. | ||||
8/13/2016 Posted On: 8/13/2016 By: OBC13 Info: I climbed Mt. Edwards today from the west side (Horseshoe Basin / Peru Creek) via the Argentine Pass route. The only thing different from Bill Middlebrooks Southwest Ridge route description is that a good quality new footbridge has been placed over Peru Creek. | ||||
7/15/2016 Posted On: 7/15/2016 By: awake Info: Made it to the gate with my Elantra (2WD), but was a rough ride. Should be pretty easy with a 4WD. | ||||
6/12/2016 Posted On: 6/13/2016 By: Chicago Transplant Info: Peru Creek road gate is open and road is mostly dry and in good shape until you get close to the Argentine Pass TH. Some large puddles and small run-off streams before snow blocks passage within maybe 200 yards of the true trailhead. Wide shoulder just below this drift with room for 2-3 cars provides parking at the moment. | ||||
6/3/2016 Posted On: 6/6/2016 By: amandagstone Info: Called Dillon Ranger district, and they said it will likely be a couple weeks until the gate at Montezuma Rd is opened. | 1 |
|||
5/21/2016 Posted On: 5/24/2016 By: BillMiddlebrook Info: Still closed/gated at the lower parking area, at the junction with the Montezuma road. | ||||
6/25/2015 Posted On: 6/25/2015 By: CO Native Info: The road is in good shape and is clear of all snow. 2wd accessible with decent clearance. | ||||
8/15/2014 Posted On: 8/24/2014 By: emgordon Info: Summit County Media Release: A new 70-foot-span permanent bridge will be placed over the Snake River at the site of the washout, restoring vehicle travel along Montezuma Road in its pre-washout route. Bridge installation work will take place the week of Aug. 25. Crews will transport the bridge and abutments to the site in eight pieces and are tentatively scheduled set them on Wednesday and Thursday,Aug. 27 and 28. Montezuma Road will be closed to through traffic for extended periods on these two days, to allow crane operators to efficiently install the structures. Crews will pave the new bridge the week of Sept. 1, with a target of opening it for vehicle traffic by Sept. 6. Anticipated Montezuma Road closures for paving operations will be limited in number and short in duration. |