12/20/2021
Posted On: 12/21/2021 By: RWSchaffer
Info: The paved roads are almost entirely dry and clear of snow. The last four, unpaved, miles before the trailhead are covered with 2-4 inches of snow that has been well packed. My 2WD hatchback had no difficulty getting to and from the trailhead, where it parked in 4 inches of fresh snow.
 
12/6/2021
Posted On: 12/6/2021 By: Eagle Eye
Info: Here about a month later, pretty much the same conditions I posted in early November; some sections of well-packed snow (and minor ice underneath) on the road, especially in the last couple of miles. But the road is still open and so this applies to the Mt Elbert (North) TH on the Halfmoon Creek Road as well. The Mt Massive TH parking area is completely dry.
 
11/8/2021
Posted On: 11/13/2021 By: Eagle Eye
Info: Info: Despite the previous USFS message(s), I found the road was wide open Monday 11/8. A friend that lives in Buena Vista had told me the same thing (road is wide open) back in late October. The road leading to the trailhead on 11/8 was in great shape although it has some sections of hard packed snow or ice on it. No snow or ice at all in the actual Mt Massive TH parking area.
 
1
9/27/2021
Posted On: 2/2/2022 By: dwoodward13
Info: Road to TH is closed per USFS order until Oct 31st now for construction.

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd955559.pdf
https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd955560.pdf
 
1
8/24/2021
Posted On: 8/24/2021 By: dwoodward13
Info: Road to TH is closed per USFS order until September 30th now for construction.

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd946371.pdf
https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd946372.pdf
 
8/22/2021
Posted On: 8/22/2021 By: greenleaf11
Info: Road still closed. But if you can get up to Mt Massive, it's lovely because no one is up there!
 
1
8/2/2021
Posted On: 8/6/2021 By: jweber1400
Info: The road to the Mt Massive East Slope and Elbert NE Ridge trail head is closed due to construction. You can park 1 mile short of the Elbert TH, but parking is limited and starts to overflow down the road. No parking is enforced where signs are marked. This makes for a long hike just to the Massive TH, so you may want to pick another mountain/peak. The road work to the Elber TH is done and should hopefully open up soon. I'm told they will move construction barriers back gradually. Honestly, the day we went, the road was great and the parking lot, so not sure why they have not opened it up yet.
 
7/31/2021
Posted On: 7/31/2021 By: dbarnes
Info: Road still closed just after the Halfmoon Campgrounds. That is 1.3 miles before the standard Massive TH. Note that the Halfmoon Campgrounds are OPEN. Also lots of free dispersed camping along Halfmoon road leading up to the campgrounds. Parking is a bit of a mess - I highly recommend obeying the many "No Parking" signs immediately ahead of the road closure. It was pretty disappointing to see that there was no equipment or signs of any activity along the closed section of the road so my guess is that it will remain closed for a long time. A campground employee said they are having trouble contracting a crew to clear out the trees?? I measured Total vertical for the East Slopes of Massive at 4503', so pretty much the same as from the standard TH.
 
7/26/2021
Posted On: 7/26/2021 By: bxpaisley
Info: Anybody know the status of the road as of 7/26? Know what authority would know? - Thanks
 
7/26/2021
Posted On: 7/26/2021 By: bxpaisley
Info: Anybody know the status of the road as of 7/26? Know what authority would know? - Thanks
 
1
7/26/2021
Posted On: 7/26/2021 By: dwoodward13
Info: Road to TH is closed per USFS order until August 31st now for construction.

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd933811.pdf
https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd933812.pdf
 
7/11/2021
Posted On: 7/12/2021 By: Eagle Eye
Info: I'll get on here to add what I think is key information about the current closure on Halfmoon Creek Road. The closure adds exactly 1.4 miles each way to reaching the Mt Massive TH. (I saw various distances!)
Also from walking it yesterday, what a noticeable great improvement to the now gravel-filled road: wider, level, filled in, side drainage, etc.
It appeared the work was done, at least to the trailhead and I wouldn't be too surprised if it opened earlier than the stated July 31st date.
Thank you for the previous links/info, dwoodward13!!
 
7/1/2021
Posted On: 7/1/2021 By: dwoodward13
Info: Road to TH is closed per USFS order until July 31st now for construction.

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd926214.pdf
https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd926215.pdf
 
6/2/2021
Posted On: 6/2/2021 By: dwoodward13
Info: Road to TH is closed until June 30th for road work per USFS

https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd916192.pdf
https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/fseprd916193.pdf
 
5/6/2021
Posted On: 5/24/2021 By: RWSchaffer
Info: Halfmoon Creek Road is open to the trailhead. Enough patches of snow remain to remind that it is not yet summer. But the road is mostly dry, and my 2WD hatchback had no difficulty reaching the trailhead. Trailhead parking is also free of snow (pictured).

Update (5/24/21): It seems that the road to the trailhead was closed again about a week after it opened. See the 5/21/21 trailhead report for the Mt. Elbert (North) trailhead for more details.
1